blocked chute problems in conveyor transfer, chutes, screens etc Wet fine ore had built-up on the tilt switch and made it inoperable The switch was not fail-safe and so when a blocked chute did occur the tilt switch did not operate, causing lost time to production Solution: Because the ore was wet at different times we had to